HVAC · Chiller · AHU
HVAC on site: chillers, AHUs and the chilled-water loop
A core package — not “coordination only”. Chillers, AHUs, FCUs, pumps, towers, duct and pipe, balancing and start-up. Brand per owner specification. Sequence: power, water, then compression — graphics last.
- Air- or water-cooled chillers, condenser water, primary/secondary pumps.
- AHU, FAHU, PAU, FCU, VAV — hang, duct, insulate, balance.
- BACnet/Modbus gateways when the contract includes them.
- DDC/BMS setpoints, schedules and approved fire interlocks when in the same package.