Solution advice: choose the system from the plant, not from a data sheet

VRF versus chiller follows load, shaft space and the operating shift. UPS follows real load and battery room heat. PLC and BMS are two layers — do not mix them in one panel unless the file says so.

  • System choice: VRF / chiller, UPS type, building DDC / plant PLC.
  • Gaps in the file: priority circuits, earthing, BACnet/Modbus ports, fire and IT boundaries.
  • Package boundaries: what Van Hung E&C installs (equipment + install + commissioning), what other contractors hold on the file.
  • Isolation programme and temporary power — before a ceiling-close date is promised.

After the survey. The owner signs the direction, then technical design.

No forced brand on this site. Owner specification — full package (equipment, install and commissioning) on one contract.