Van Hung Engineering & Construction Co., Ltd VIEN中文
Van Hung E&CVẠN HƯNG E&CEngineering · Construction

M&E · Water & drainage

Water and drainage: supply, waste, pumps, tanks — before the ceiling closes

Domestic water, floor and roof drainage, booster and drainage pumps, tanks. Pressure-tested and flushed before concealment. A frequent critical path on factories under FDI projects if left until after plasterboard.

  • Risers, floor branches, isolation valves by zone.
  • Wet-area, roof, kitchen and WC drainage — falls, access points, traps.
  • Pumps, floats, pump boards — live-water commissioning, not a dry spin.
  • Chilled-water pipework when in the same HVAC package.

Send wet-area layouts