Site survey: open the live board before we write a price
Floor area does not say which feeder may be isolated, how many minutes the batteries still hold, or whether the DDC bus has spare. We walk the plant, read the shift log, photograph the boards — then propose a solution.
On site
- Open live MSB / DB / ATS / DDC boards — labels, cable size, spare modules.
- Check drawings against the real wiring. No as-built: draft one at the panel.
- Read the shift log: repeat faults, permitted isolation hours, circuits that must stay live.
- HVAC and ELV: plant status, sensors still alive, remaining PoE and conduit.
Deliverable: site note, board photos, work list before the quote. Occupied sites without as-built: about seven working days after the survey — survey, not finished install.
Next: solution advice · technical design. Send board photos.
Site survey
Open the live board, measure tray, read the shift log — price from the plant, not from floor area.
02Solution advice
Choose the system, name gaps in the file, fix the fire / IT / cooling boundary.
03Technical design
Scheme, shop drawings, I/O schedule, single-line when the contract assigns it.
04Installation
Wall–floor–ceiling programme locked to pipe, tray and ceiling close.
05Renovation · upgrade
Isolate one circuit while the plant, hospital or branch stays open.
06Maintenance · servicing
Monthly / quarterly visits and year-2–3 cover. Call-out time in writing.