Switchboards
MSB, DB, ATS: built to the drawing, labelled for operations
A board that looks finished but cannot be isolated safely is not finished. Door schematics match the iron, not last year’s tender file.
Assembly to approved shop drawings, torque and insulation records, live-board renovation outside peak hours when the plant is occupied.