UPS
UPS: choose topology before you choose kVA
Which loads must survive a grid loss, for how long, and who is alarmed when batteries age. Online for servers and PABX; line-interactive where the load allows.
We survey the room, install, run a witnessed hold-up test, and bring dry contacts or Modbus to the BMS when specified.